Lining! Lining! Lining! You love Lining right? It keeps the water out, and makerspace in.
Well, this weekend is your weekend! We’re going to be screwing a tonne of it to the ceiling, and you’d look GREAT doing it too - if you’re new, old, or just out of practice, all are welcome, much to be learnt! Even more fun to be had.
RSVP below from 10:30 AM.
Beers on me after work c/o Canopy.
@conomara may also do some stuff on Saturday if we can get a good team down both days?
Huge process today, we investigated the leak in the toilet again, apparently now fixed and repair started, but we want to focus on construction on the weekends and Wednesday evenings, so those that want to work on the toilet please focus this on other nights.
Fran and his brother Robin threw battens up so that now 2/3rds are done, although some alterations might be required because of the shape of the arch.
We started getting the long side sheets up, but it turned out to be a major pain, there were a few things we did in the prep that made it much harder, it turns out saving time by reusing the old battens caused it to be much more complicated.
We’re now probably at a point where materials for walls and floors could be ordered. We’ll be at both of those points pretty sharpish, and already we can be Starting the divide between phase 1 and 2 and / or cladding the phase 1 side of the block wall.
cool, great to see lining go up,should we hold off getting floor materials? i think keeping phase two floor as free as possibwill speed up the linings and battens and we prob wont be starting floor for a while right?
I think Conor’s right. There no point in starting the floor before the lining’s done, and that job is easier with a clear floor.
The Phase1/2 wall can go in as soon as the first row of lining is done, so those materials are worth getting. Can we make use of any of the old rafters that have been hanging around for ages?
i thought we were going to try to get the dividing stud wall between phase one and two started once the first new row of lining went up? that would allow us pretty much seal phase one away from work?
We are building that stud wall around the doors, do we have the doors?