Does the former need to be cut to the correct height too? I can’t see how we get an exact height without cutting it down …
Make the Space - Sunday 22nd November 11AM
rest a spirit level on the edge of phase 1 floor and hold a calibrated stick under the other end to check the height. It doesn’t have to be super precise, cos there will be mortar on top for the first course of blocks.
Think the key thing is about this evening that we need someone there who knows what to do, the lackys are useless without the governor.
@Ana_Nieto are you coming still?
I’ll be there in a bit but looks like @timahrensbach isn’t there not @peter_hellyer yet
Not sure what job to do either? Anyone???
Am on the way, will be there in about 30mins
I’m getting on my biiiiiike!
Yep! On the way!
Ana Nieto-Ortega
Lots of good work done this evening.
Form for the wall footings you say?
I’ll give you form for the wall footings ^
^ish, the floor is far from level so we’ll need to come up with some fancy way of filling some of the gaps at the form -> floor interface. Either that, or just stick a sheet of cardboard inside the form…
Edit: expanding foam?
It will be fine, just keep the concrete on the dry side for the base layer. Not actually dry, but with very little slump.
I’m still concerned about underfloor ventilation.
yeah, need several openings in the dirty/clean wall.
(it’d be easy to do it in the block courses, but they’d be blocked by the insulation)
Was woodworking night not on tonight?
Easily done, just put a couple dividers into the form and we’re away
Place some short lengths of drainpipe in before the concrete?
Perfect 210 mm wooden blocks, anyone?!
I’ll be back again tomorrow, hosting the Open Night, but happy to help out between shows!