Make the space is on on Sunday. Lots of work to get done to clear phase 2 for the impeding works. The schedule for the build is really tight, so we really need as many hands on deck as possible. Not sure who will be down this weekend, and I’m at work on Sunday, but please come! It’ll be mega fun.
All welcome, new and old. Make The Space is a great time to come and get to know people, and lend a hand to making the space great!
Having seen the great job that’s been done of clearing up so far, I think you’re ready to put down formwork for the dividing wall footings. I can supply a measured drawing.
We also NEED to have a foreperson on site. With no leader, nothing useful gets done. Somebody please volunteer for this role and I will brief you.
Could we use the bricks as the form? we’ll still have loads left over after wall-gate is complete. Two rows of blocks with a channel in the middle which is then filled with concrete? Would be over engineered, but probably quick.
Here the footing detail for the blockwork wall. It’s simple. It goes back into phase 2 by 890mm, it’s 215mm wide, it’s aligned with the red stripe, ant it’s 245mm lower than the phase 1 floor.
The timber walls will have similar blockwork underneath (for sound isolation) but we don’t need them right now. Formwork for this bit should keep you busy.
Quick note from trustees chat room:
Dermot Jones
Is there a modular/sizing/spacing reason for the wall footing?
The blocks supporting phase one are laid directly on the concrete with 10mm approx mortar bed gap.
Tom Newsom
The dusty/messy wall footing will have openings to allow air through
The height is such that we’ll lay two courses of 100mm blocks (on the flat) and arrive 7mm below the OSB, which allows for some neoprene (or similar) padding under the OSB in the doorways
Hey guys, im away for two weeks, Im back on the 6th of Dec and totally free for a week, so happy to spend this time laying blocks, doing lining etc. Hopefully we can continue the momentum we are getting going, get the space cleared and start into phase two proper over the coming weeks.
we could have the bulk of it done by xmas if we get organised and motivated