Snug upgrades!

We are well into upgrading the snug!

Joe and I have:

  1. removed the insulation and mesh from the block side of the wall. Gained 20cm of space against the arch 1 wall.
  2. added 4 steel wall brackets to support the snug roof.

To get the left end sorted into the painting and finishing room, we’ve pulled out all the shelving and taken up the floor. Please be careful! We’re adding brick drainage and then will insulate and panel the outer snug wall.

Thank you for patience while the contents of the snug are in the screen printing shop. We will be doing a full assessment of member projects left in the snug before putting them back in, so stay tuned if you know you have materials there.

9 Likes

Great work guys!

1 Like

Wall sealed and capped! No more drips.