Hello everyone.
Much has been done, much still to be done, much making of spacing to be made.
Sorry I can’t make it this weekend (again! - family matters to attend to) - but that doesn’t mean you shouldnt come! please do! So we can get a good idea of numbers this weekend - could you please sign up below? We’d really like a good turn out this week, so whether you’re old, new, or just want to check us out, please come down, pick up a tool and help us make-the-space.
There are a whole bunch of other jobs that need to get done:
- Washrooming
- Replace floor void (recut from the right material)
- finish adhesive floor tiles
- Splashback tiling around sink(s).
- Hang mirror
- fitting handles and grab bars.
- Finish up the plumbing of the second sink (just needs connecting to the mains and final bit of work on the waste)
- Kitchen
- Get going on a former for the kitchen worktop
- Get going on the bookshelf / general storage / utilities closet.
- Sitting Area
- Make a start on making some side / coffee tables.
- Painting
- we can ALWAYS find something that needs a lick of paint / oil.
- Phase 2 works.
- Get the space for the short side of the wall clear
- Pour a level footing for the wall
- ADMIN
- Go to this page, update and bump https://discourse.southlondonmakerspace.org/t/phase-1-master-to-do-list/
If you can make it, please let us know what time you can give below, else we would like people to be at the space by 11AM in order for us to do a proper safety briefing and allocate jobs.
See you then!