Lots got done last week at Make The Space with a combined effort from the woodworking team, we’re itchingly close to having a proto-kitchen up and running. There will undoubtedly this week be many more kitchen aligned things to do as well as many many more, fun and interesting jobs.
Unfortunately, I can’t make it this weekend - but that doesn’t mean you shouldnt come! please do! So we can get a good idea of numbers this weekend - could you please sign up below? We’d really like a good turn out this week, so whether you’re old, new, or just want to check us out, please come down, pick up a tool and help us make-the-space.
Finally, if none of the above sound like fun, there are a whole bunch of other jobs that need to get done:
- Plumbing
- Plumbing for Hot Water
- Washrooming
- Replace floor void (recut from the right material)
- finish adhesive floor tiles
- Splashback tiling around sink(s).
- Hang mirror
- fitting handles and grab bars.
- Finish up the plumbing of the second sink (just needs connecting to the mains and final bit of work on the waste)
- Kitchen
- Get going on a former for the kitchen worktop
- Get going on the bookshelf / general storage / utilities closet.
- Sitting Area
- Make a start on making some side / coffee tables.
- Painting
- we can ALWAYS find something that needs a lick of paint / oil.
- Phase 2 works.
- Start thinking about the great wall of makerspace
- Get the space for the short side of the wall clear
- Pour a level footing for the wall
- ADMIN
- Go to this page, update and bump https://discourse.southlondonmakerspace.org/t/phase-1-master-to-do-list/