The good ship Phase 2 sets sail!
Friday Night is alright for Concrete
3 Likes
Nice!
Two bags of ballast (sand pebble mix) or 2 bags of pebbles (no sand)? I’m going shopping now
Flickr’d and Tweet’d.
1 Like
Either or, we don’t have any ballast left, and only a half bag of pea shingle. To do the L we used two bags of ballast and 1.5 bags of pea shingle.
Sorry I missed last night, but I will be BBQin tomorrow!
I could pass by b&q on the way in if we need more of the concrete / ballast related materials?
I have three bags of ballast on the van ready for tomorrow
1 Like