Friday Night is alright for Concrete

Tags: #<Tag:0x00007fa48d21bd38>

The good ship Phase 2 sets sail!

3 Likes

Nice!

Two bags of ballast (sand pebble mix) or 2 bags of pebbles (no sand)? I’m going shopping now

Flickr’d and Tweet’d.

1 Like

Either or, we don’t have any ballast left, and only a half bag of pea shingle. To do the L we used two bags of ballast and 1.5 bags of pea shingle.

Sorry I missed last night, but I will be BBQin tomorrow!

I could pass by b&q on the way in if we need more of the concrete / ballast related materials?

I have three bags of ballast on the van ready for tomorrow

1 Like