The space is crazy messy due to the construction work.
Once the rest of the floor is down all the gear that’s piled up in phase one can go back into phase 2…or can it?
It very much depends on the varnishing of the floor.
So we need to decide on a finish/procedure.
I think that the state that phase 1 is in note needs to be as short as possible. This probably means finishing floor, moving gear to wet room, varnish dusty floor, move gear from wet to dusty, varnish/paint wet floor.
Thoughts?