The space is crazy messy due to the construction work.
Once the rest of the floor is down all the gear that’s piled up in phase one can go back into phase 2…or can it?
It very much depends on the varnishing of the floor.
So we need to decide on a finish/procedure.
I think that the state that phase 1 is in note needs to be as short as possible. This probably means finishing floor, moving gear to wet room, varnish dusty floor, move gear from wet to dusty, varnish/paint wet floor.
We have lost 50% of our floor space there the front is bound to be unusable , but it will be finished by the end of the month and we will have a working space .
Hopefully the floor will be finished tonight
I am working as hard as I can i simply can’t do any more last night i had to use a mate of mine as second man if we don’t finish soon we will finish the day before we lose the lease .
The last time everything got packed into the back the next day we had to unpacked it to get the tower out . Let’s get the floor down and the wall skinned .