Arch 2 ( Done right through )

Dear all, :smiley: Outside area (Arch 1-2 front ) rubbish picked up and leaves dealt with. Wood shop, benches tidied down , tools put away, sides straightend out, a bit of a dust around, bins emptied, a damn good hoover around, pottery area hoovered ,Metal work area, tables tidied down , tools put away, scrap in scrap bins , a good hoover around, bins emptied, welding/grinding/sandblasting, sides and floor hoovered, back passageway hoovered,
3 hours and 15 mins today.
A few things to note-
If anyone would like to know why there is a chalk line at the front of Arch 1its to keep out the ants ,
We have a fly problem in the toilet area (I would suggest we put a fine wire mesh on the outside of the fan to keep them entering when the fan cuts out )
The thicknessor plainer/ industrial sander/router table/chop saw were left uncleaned at the very least you should make an effort to clean up for the next person to use it.
Metal work area, the lathe/chop saw / drill were not left in a clean state , a dirty machine is a dangerous machine.Anything else drop me a line. Keep well . Brian D=

1 Like