Any making the space going on today?
I can pop down in half an hour, got loads on my plate this weekend though.
Glass needs finishing…
I think the floor still needs the rest of the screws put in? There should be 3 across each board on each joist.
Rubbish in big green bin needs bagging up?
Windows at front: lower timber on outside is mouldy/dirty. This needs a ssnd most likely. But mask off the glass to avoid scratching it… And use 120 grit. Then it can have some fresh Osmo oil