This weekend the weather is looking good and while @Dermot is away the mice will play…
Please RSVP if you are up for helping from 11am on Sunday, or Saturday.
There are a number of jobs to be done:
- Fitting the remaining side panels into place and cutting one or two of them to square.
- Final coat of the wall if needed.
- Fix CCTV wiring in place on the front of the arch.
- Remove graffiti from the front of the shutter.
- Continue plumbing in 2nd sink in phase 2.
- Continue tidying up phase 2 with boxes.
- Fit a backstop on the front door to stop it swinging too far open.
- Adjust the rainwater pipe outside to prevent it soaking into the front wall.
- Fit some form of flashing over the shutter to stop rain running down the front.
Done
- Final coat/colour on the front of the arch.
- Under coat (10% water) wash the wall along the back of Costcutter and Jellytots.
- Experiment with social area/kitchen layout.
- Remove the yellow builders foam from the front.
- Create a permanent solution to the front door RFID reader.